Pathway MR Users Guide Instrukcja Użytkownika Strona 1

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Panel sterowania Pathway MR Users Guide. Pathway MR Users Guide User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 0
DMXPathfinder MR
Users GuideUsers Guide
Version 1.1
October 1998
Gray InterfacesGray Interfaces
480C - 36 Avenue S.E.
Calgary, AB, T2G 1W4
Canada
Phone: (403) 243-8110
Fax: (403) 287-1281
E-mail: support@gray-interfaces.com
Web site: www.gray-interfaces.com
Przeglądanie stron 0
1 2 3 4 5 6 ... 15 16

Podsumowanie treści

Strona 1 - Users GuideUsers Guide

DMXPathfinder MR Users GuideUsers Guide Version 1.1 October 1998 Gray InterfacesGray Interfaces 480C - 36 Avenue S.E. Calgary, AB, T2G

Strona 2 - CONTENTS

DMXPathfinder LR Installation & Assembly 9 Pin 1 -- Signal Common (shield) Pin 2 – DMX Data (-) Pin 3 – DMX Data (+) Pin 4 – Talkback Data (-) P

Strona 3 - INTRODUCTION

DMXPathfinder LR Installation & Assembly 10 Patching To assign outputs to inputs, first remove the front cover to access the Crosspoint Card

Strona 4 - BEFORE STARTING

DMXPathfinder LR Index 11 Chapter 2: Maintenance & Testing TESTING THE INSTALLATION Once all connections are made and inspected for possible er

Strona 5 - RACK SIZING AND PLACEMENT

DMXPathfinder LR Index 12 To replace an Output Module card, first remove the four front-panel Phillips screws and the cover panel, then grasp the

Strona 6 - MOUNTING TERMINATION BOARDS

DMXPathfinder LR Index 13 The Fluke 650's signalling is not compatible with the DMXPathfinder MR electronics or any other DMX generating or r

Strona 7 - MODULE PREPARATION

DMXPathfinder LR Index 14 carried out. Try swapping input or output cable connections on the back of the DMXPathfinder modules with adjacent ones to

Strona 8 - MODULE INSTALLATION

DMXPathfinder LR Index 15 INDEX A Advanced Troubleshooting · 13 Ambient temperature · 3 Assembly · 3 B bus terminator · 7 C CABLE A IN · 7 CABLE

Strona 9 - I/O CABLE CONNECTION

DMXPathfinder LR Contents 1 CONTENTS INTRODUCTION ...2 WELCOME TO THE WORLD OF DM

Strona 10

DMXPathfinder LR Introduction 2 INTRODUCTION WELCOME TO THE WORLD OF DMXPATHFINDER! This Installation Guide is intended to walk you through a typic

Strona 11 - Patching

DMXPathfinder LR Installation & Assembly 3 Chapter 1: Installation and Assembly SUMMARY This section describes how to correctly assemble the

Strona 12 - CARD REPLACEMENT

DMXPathfinder LR Installation & Assembly 4 the same rack, allow for at least a 1U ventilation panel at the top and bottom of the rack. Power

Strona 13 - TEST PROCEDURES

DMXPathfinder LR Installation & Assembly 5 recommended). To calculate minimum height, add up the number of 2U Input Modules and 4U Output Modul

Strona 14 - ADVANCED TROUBLESHOOTING

DMXPathfinder LR Installation & Assembly 6 Model P2020 32-way terminal block transition boards are the most commonly used method of connecti

Strona 15 - DMXPathfinder LR Index

DMXPathfinder LR Installation & Assembly 7 Unpack all of the DMXPathfinder MR system modules and accessories and arrange on a flat surface. F

Strona 16

DMXPathfinder LR Installation & Assembly 8 I/O CABLE CONNECTION Strip back about 3 inches (8cm) of cable jacket and braid shield from each i

Komentarze do niniejszej Instrukcji

Brak uwag